3 INSTALLATION
3.1 TRANSPORT
Transport UPS only in upright position!
The UPS is packaged on a pallet suitable for handling with
a forklift.
Pay attention to the center of gravity.
The UPS must be moved in upright position.
Do not tilt cabinets more than +/- 10° during handling.
Move the UPS in it’s original package to the final
destination site.
Do not stack other packages on top: This could damage
the UPS.
If the UPS must be lifted by crane, use suitable lifting straps
and spreader bars.
Note of the center of gravity marked on the package.
Take all necessary precautions to avoid damage to the
cabinet while hoisting the UPS.
Forklift
Crane
NOTE !
Fig. 3.1-1 UPS cabinets moving
Check for sufficient floor and elevator
loading capacity.
3.1.1 Dimensions and weight
Dimensions SG Series 100 - 120 - 150 kVA
(W x D x H)
47.25 x 31.50 x 70.90 inches
1,200 x 800 x 1,800 mm
S
G
T5000_1
00-150
_U
P
S
dim
en
s
ion
s
_
G
E
_
01
U
S
H
W
D
Fig. 3.1.1-1 UPS cabinet dimensions
Weight SG Series 100 - 120 - 150 kVA
UPS rating
Weight
Floor loading
lbs/sq.ft - kg/m
2
lbs / kg
SG Series 100 kVA
1,930 / 875
187 / 912
SG Series 120 kVA
2,007 / 910
195 / 948
SG Series 150 kVA
2,161 / 980
210 / 1,021
P.S.: Weights including the 5th harmonic filter.