beautypg.com

Planning information – Theatre Solution Jury Base Seating User Manual

Page 44

background image

Jury Base Seating Planning, Installation & Specification Manual

43

Planning Information


Theatre Solutions offers a variety of services designed to help in the planning and successful completion of any project
requiring the use of fixed seating. Our services include analyzing proposed architectural plans and developing a seating
layout that best meets the project criteria. We will assist in resolving issues related to code compliance and sight line
development. All TSI preliminary services are free to architects and potential customers.

Further assistance is offered at those times when the architect has a need for custom components or a totally new
product concept. The TSI team of experienced product designers welcomes the opportunity to assist designers in
developing solutions to the most unique project requirements.

Program/Schematic Design Based on the estimated project requirements, we will assist architects in the
development of a preliminary budget covering the fixed seating. This will ensure the establishment of a project
budget that includes adequate funding for the product that meets the architect’s requirements.

Design Development During this critical phase of the project, we will assist the architect in the development of
preliminary chair layout drawings, taking into consideration proper sightlines and code compliance. In many
cases, the layout drawings must be perfected through several submissions. Special product requirements and
possible solutions will be offered at this time. TSI will develop preliminary fixed seating specifications, which will
be submitted to the architect for review and possible modifications. By solving design and specifications
problems in greater detail during this phase of the work, the architect is able to simplify project documentation
and avoid potentially costly oversights.

Custom Designs TSI’s staff includes experienced product designers who are capable of creating custom
products and components which may be required to address unique project specifications. Additionally, TSI
enjoys greater flexibility in production as a result of our diverse manufacturing and supply infrastructure.

When SOM (Chicago) Architects, Chang Jo Architects, and Artec Consultants determined the construction
design for the LG Arts Center in Seoul, South Korea, they knew they wanted a finished wood surface on the
face of all risers. With structural and acoustic considerations in mind, the final design included a build-out of
more than 2” from the structural concrete. TSI developed a unique riser mount connection that provided
excellent strength, ease of installation, and elegant design.

During the construction of the Kodak Theater, the home of the Academy Awards, architect David Rockwell
and theater consultants, Theatre Projects Consultants, requested that TSI be responsible for developing
cast glass sculptures for the end panels of the chairs and for the wall panels. In response, TSI identified and
commissioned the services of a glass artist capable of producing the required complicated molds necessary
to cast these beautiful sculptures. These unique glass sculptures, which are back lit, can be seen in the
custom end panels of the chairs and in the panels located on the walls of the room.


Construction Documents As the architectural working drawings are finalized, TSI will update the chair layout
and produce drawings to reflect all changes implemented since the preliminary documentation. TSI will also
finalize the seating specifications in any format required by the architect to insure consistency with the rest of the
contract documents. This will allow the architect to include the specifications and drawings in the construction
documents without further work.

Project Management Every project awarded to TSI, regardless of size, will be assigned to a dedicated project
manager who ensures that every detail of the contract receives full attention. The shop drawing submission will
be completed in accordance to the project requirements and will take into consideration every detail unique to
the project. It will include the exact location of every chair, installation details, the selected fabric and other
appropriate details and options that are included in the contract. Once the shop drawing submittal is approved,
TSI will schedule the production of the order in coordination with the project schedule.

If the installation is included in TSI’s contract, it will always be accomplished by a factory-trained installer and, in
cases where necessary, under the supervision of TSI factory representatives.

Every portion of this work will be accomplished under the direct supervision of one or more of the TSI principals
who, along with the project manager, will always be available to clarify any questions or discuss any aspect of
the project with the project leaders.

The TSI design staff is anxious to work with you on your next courtroom project.