SENA ProBee-ZE10 User Manual
Page 55
55
ProBee-ZE10 User Guide Rev.1.5
6.5
Configuration Example #2: 1 Coordinator and 2 End-Devices
Here is another example assuming different system configurations. This example can be described as
follows:
One ZE10 module acts as a coordinator and it is connected to a host computer via serial cable.
Two ZE10 modules act as end-devices.
Turn on/off the LEDs of the end-devices remotely through the coordinator
Figure 6-4 Example #2: 1 Coordinator and 2 End-Devices
6.5.1
Coordinator Configuration
Hardware configuration for the coordinator is as follows:
Set the HOST switch to UART
Connect a serial cable between a host computer and the coordinator
The AT commands for coordinator configuration is as follows:
AT+NODETYPE=1
OK
AT+PANID=7772
OK
ATZ
OK
6.5.2
End-devices Configuration
Hardware configuration for the coordinator is as follows:
Set the GPIO_OUT switch to LED_ON
The AT commands for the end-devices are as follows:
- Parani-ESD100-110-200-210 (56 pages)
- HD1300 (36 pages)
- Parani-SD1000 (60 pages)
- Rhio232 (76 pages)
- Parani-UD100 (26 pages)
- Parani-UD100 (27 pages)
- ProBee-ZS10 (76 pages)
- Parani-MSP100 (73 pages)
- Rhio10 (99 pages)
- UPSLink100 (54 pages)
- HD132x Series (56 pages)
- Parani100 (69 pages)
- PS810 (110 pages)
- HD1100 (40 pages)
- PS210W (104 pages)
- LS100W (50 pages)
- Parani-BCD100 (22 pages)
- ProBee-ZU10 (69 pages)
- Parani-SD1100 (53 pages)
- ProBee-ZE20S (102 pages)
- Parani-SD200L (46 pages)
- Parani-SD100-200 (50 pages)
- Parani-SD1000U (49 pages)
- Parani-BCD110 (65 pages)
- Parani10 (52 pages)
- Parani-BCD110V3 (85 pages)
- Device Server and Serial_IP Application Guide (26 pages)
- NEMO10-SK (54 pages)
- STS Series (131 pages)
- HelloDevice UniversalComm (13 pages)
- LS110 (66 pages)
- ProBee-ZE20S-SEME (118 pages)
- ProBee-ZE20S-HAOL (95 pages)
- Promi-ESD02 (63 pages)
- Promi-MSP Quick Install (9 pages)
- HD1200 (53 pages)
- PS400 (68 pages)
- Serial_IPTM Redirector 4.3 (84 pages)
- Promi-MSP User Guide (73 pages)
- LS100 (48 pages)
- LS100M-SK (48 pages)
- DirectPort UPCI (20 pages)
- Parani-BCD110-210 (71 pages)
- Parani-ESD100V2-110V2 (61 pages)