Sidedraw system installation, Wind ring installation – Grain Systems Tanks PNEG-2400 User Manual
Page 73
7. Sidedraw Accessory Instructions
PNEG-2400 CFL Commercial Farm 4" Corrugation Externally Stiffened Grain Bin
73
1" Diameter Anchor Bolt Requirements for Sidedraw Systems
1" Diameter Anchor Bolt Requirements for Sidedraw Systems Installed in
CFL - 4" Corrugation Commercial Tanks
2 Post Tanks (2 Stiffener per Sidewall Sheet)
3 Post Tanks (3 Stiffener per Sidewall Sheet)
Sidedraw System Installation
Wind Ring Installation
1. Sidedraw systems may require additional wind rings. They will need to be attached at the
beginning of assembly because they go on the upper most rings. (See wind ring requirements
chart
.)
2. Attach the wind ring pipe to the stiffeners using 3/8" x 1" bolts through the flange of the stiffener.
In some cases field drilling of wind ring locations may be required.
3. Attach wind ring pipe section to the stiffener using two (2) 3/8" x 6" (S-7248) wind ring clamps.
4. Place pipes end to end without overlapping. Fasten together using two (2) wind ring couplers and
six (6) 3/8" x 1" flanged head bolts with nuts. Couplers should be centered on the seam of pipes.
Figure 7A
Nominal Tank Diameter
Total Number of Anchors
54
36
60
40
Nominal Tank Diameter
Total Number of Anchors
54
54
60
60