beautypg.com

Sidewall construction, Sidewall construction instructions, Bin assembly – Grain Systems Tanks PNEG-2400 User Manual

Page 17

background image

3. Bin Assembly

PNEG-2400 CFL Commercial Farm 4" Corrugation Externally Stiffened Grain Bin

17

Sidewall Construction

Sidewall Construction Instructions

Gauge Color Code

1. Before bolting the sidewall sheets together, check for the proper gauge of steel for the first ring.

Sidewall sheet layout by gauge is stapled to front of manual provided with the shipped bin. If missing
contact GSI. Higher gauge numbers denote the thinner materials. (For example, 20 gauge material
is thinner than 14 gauge.
)

2. In erecting most grain bins, the thinnest material usually goes on top, therefore the first sidewall ring

you assemble will be the top ring of the bin.

3. Check the various gauges of the bin with the color code chart and begin building accordingly.

REMEMBER assemble the top ring first.

4. Decal sheet will be installed in the second ring from the top.

Figure 3A

Gauge

Color Code

20

Red

19

Black/Yellow

18

Orange

17

Pink/Light Blue

16

Blue

15

Brown/Red

14

Green

13

Yellow/Blue

12

Black

11

Pink/Purple

10

Light Blue/Purple

9

Blue/Orange/Purple

8

Yellow/Purple

6

White/Purple

5

Fluorescent Green/Purple