Sidewall construction, Sidewall construction instructions, Bin assembly – Grain Systems Tanks PNEG-2400 User Manual
Page 17
3. Bin Assembly
PNEG-2400 CFL Commercial Farm 4" Corrugation Externally Stiffened Grain Bin
17
Sidewall Construction
Sidewall Construction Instructions
Gauge Color Code
1. Before bolting the sidewall sheets together, check for the proper gauge of steel for the first ring.
Sidewall sheet layout by gauge is stapled to front of manual provided with the shipped bin. If missing
contact GSI. Higher gauge numbers denote the thinner materials. (For example, 20 gauge material
is thinner than 14 gauge.)
2. In erecting most grain bins, the thinnest material usually goes on top, therefore the first sidewall ring
you assemble will be the top ring of the bin.
3. Check the various gauges of the bin with the color code chart and begin building accordingly.
REMEMBER assemble the top ring first.
4. Decal sheet will be installed in the second ring from the top.
Figure 3A
Gauge
Color Code
20
Red
19
Black/Yellow
18
Orange
17
Pink/Light Blue
16
Blue
15
Brown/Red
14
Green
13
Yellow/Blue
12
Black
11
Pink/Purple
10
Light Blue/Purple
9
Blue/Orange/Purple
8
Yellow/Purple
6
White/Purple
5
Fluorescent Green/Purple