3. Bin Assembly

PNEG-2400 CFL Commercial Farm 4" Corrugation Externally Stiffened Grain Bin

21

Bolting Requirements - 2 Stiffeners per Sidewall Sheet

• Use 3/8" x 1-1/2" (S-5060) bin bolts at splice locations to attach the stiffener/splice plate to

the sidewall.

• Use 3/8" x 1-1/2" (S-5060) bin bolts on laminated stiffeners to attach stiffeners to the sidewall sheet.

• Refer to

Stiffener Assembly Details on Page 65

and the

Caulking Detail on Pages 19

and 20

for

stiffener assembly hardware usage and caulking details. Refer to hardware

identification section

on Page 50

for aid in hardware identification.

Figure 3G As Viewed from Outside

Sidewall Gauge

Horizontal Seam

Vertical Seam

Stiffener to Sidewall

Overlap Seam

20-15

5/16" x 3/4" (S-275)

[8]

5/16" x 3/4" (S-275)

[42]

3/8" x 1" (S-455)

[22]

5/16" x 3/4" (S-275)

[2]

14-12

3/8" x 1" (S-455)

[20]

3/8" x 1" (S-455)

[42]

3/8" x 1" (S-455)

[22]

3/8" x 1" (S-455)

[2]

11-10

3/8" x 1" (S-455)

[20]

3/8" x 1" (S-455)

[63]

3/8" x 1" (S-455)

[22]

3/8" x 1" (S-455)

[2]

9-8

3/8" x 1" (S-455)

[20]

3/8" x 1" (S-455)

[63]

3/8" x 1-1/2" (S-5060)

[22]

3/8" x 1-1/2" (S-5060)

[4]

6-5

3/8" x 1-1/2" (S-5060)

[20]

3/8" x 1-1/2" (S-5060)

[63]

3/8” x 1-1/2" (S-5060)

[22]

3/8" x 1-1/2" (S-5060)

[4]