Bin assembly – Grain Systems Tanks PNEG-2400 User Manual
Page 22
3. Bin Assembly
22
PNEG-2400 CFL Commercial Farm 4" Corrugation Externally Stiffened Grain Bin
Bolting Requirements - 3 Stiffeners per Sidewall Sheet
• Use 3/8" x 1-1/2" (S-5060) bin bolts at splice locations to attach the stiffener/splice plate to
the sidewall.
• Use 3/8" x 1-1/2" (S-5060) bin bolts on laminated stiffeners to attach stiffeners to the sidewall sheet.
• Refer to
Stiffener Assembly Details on Page 65
stiffener assembly hardware usage and caulking details. Refer to hardware
identification section
for aid in hardware identification.
Figure 3H As Viewed from Outside
Sidewall Gauge
Horizontal Seam
Vertical Seam
Stiffener to Sidewall
Overlap Seam
20-15
5/16" x 3/4" (S-275)
[8]
5/16" x 3/4" (S-275)
[42]
3/8" x 1" (S-455)
[21]
5/16" x 3/4" (S-275)
[2]
14-12
3/8" x 1" (S-455)
[20]
3/8" x 1" (S-455)
[42]
3/8" x 1" (S-455)
[21]
3/8" x 1" (S-455)
[2]
11-10
3/8" x 1" (S-455)
[19]
3/8" x 1" (S-455)
[63]
3/8" x 1" (S-455)
[33]
3/8" x 1" (S-455)
[2]
9-8
3/8" x 1" (S-455)
[20]
3/8" x 1" (S-455)
[63]
3/8" x 1-1/2" (S-5060)
[33]
3/8" x 1-1/2" (S-5060)
[4]
6-5
3/8" x 1-1/2" (S-5060)
[20]
3/8" x 1-1/2" (S-5060)
[63]
3/8" x 1-1/2" (S-5060)
[33]
3/8" x 1-1/2" (S-5060)
[4]