beautypg.com

Wind ring assembly instructions, Chapter 5 wind ring assembly instructions, Wind ring assembly – Grain Systems Tanks PNEG-2400 User Manual

Page 69

background image

PNEG-2400 CFL Commercial Farm 4" Corrugation Externally Stiffened Grain Bin

69

5. Wind Ring Assembly Instructions

Wind Ring Assembly

Figure 5A

1. To connect wind ring pipe to the stiffeners, attach with 3/8" x 1" bolts through the flange of the

stiffener. Field drilling of wind ring locations may be required in some cases.

2. Attach wind ring pipe section to stiffener using two (2) 3/8" x 6" (S-7248) wind ring clamps.

3. Place pipes end to end without overlapping. Fasten together using two (2) wind ring couplers

and six (6) 3/8" x 1" flanged head bolts with flanged nuts. Couplers should be centered on the
seam of pipes.

Figure 5B