6. Operation

36

PNEG-1049 10"-12" Commercial Bin Sweep Augers

Figure 6L

23. Check the sweep carrier wheel assembly. If necessary, adjust the height so that the sweep arm

assembly is close to the floor, but will not contact the floor, intermediate well top flanges or the
floor screws.

24. Exit the grain bin.

25. Make sure everyone is outside of the bin and clear of the equipment.

26. Start the unload auger and then the bin sweep. Shortly, the swept pile will have been removed by the

bin sweep.

27. Disconnect and lock out all power to the bin sweep and unload auger.

28. Repeat

Step 20 on Page 34

, moving the grain into a smaller circular pile, as shown in

Figure 6L

.

29. Repeat

Step 21 on Page 34

.

30. Exit the grain bin.

31. Make sure everyone is outside of the bin and clear of the equipment.

32. Start the unload auger and then the bin sweep. Shortly, the swept pile will have been removed by the

bin sweep.

Cleaned area

Remaining grain

Bin wall

Bin sweep

Bin wells