Grain Systems Unload Augers PNEG-1049 User Manual
Page 30
6. Operation
30
PNEG-1049 10"-12" Commercial Bin Sweep Augers
3. Make sure that ALL belt(s) are tensioned properly on the unload system.
4. Make sure that ALL shield(s) are in place and that the belt(s) and pulley(s) are able to move freely.
5. Inspect the drive unit for any problems or potential problems.
6. Be aware of ALL emergency shut down procedures. Two (2) people must always be in a position
where the operation of the equipment can be monitored.
7. Start the unloading auger. The motor is located on the drive unit outside the bin, attached to the
unload tube.
8. Gravity unload the bin, through the center well first.
9. Always close the well gates and allow the unload auger to clean out before stopping the
unload auger.
CAUTION
Failure to perform any and all of these pre-start checks may cause damage to the
equipment and could cause SERIOUS INJURY or DEATH to those in the work
area. A failure to perform any and all of these pre-start checks may also be a
misuse of the equipment, which may void the warranty.
DANGER
ALWAYS keep ALL guard(s) and shield(s) in place until all the power is disconnected
and locked out.
WARNING
Make certain that ONLY trained operators are in the work area before operating or
moving the equipment. Two (2) people must always be in a position where the
operation of the equipment can be monitored.
CAUTION
DO NOT start or stop the auger while it is under load, this may cause the auger
to “jam”.
CAUTION
Failures may occur in the auger is run full before it has been polished by the
grain, during the break-in period. The auger should run at a partial capacity until
it becomes polished and smooth. Several hundred bushels of grain should be
run before operating at full capacity.
CAUTION
Be aware of any unusual vibration or noises during the initial start-up and
break-in. If anything unusual is detected, immediately shut down the auger,
disconnect and lock out the power supply before servicing. Visually inspect the
auger periodically during the operation.
DANGER
ALWAYS shut down, lock out and disconnect the power supply before adjusting,
servicing or cleaning the equipment.
WARNING
NEVER unload the bin from the intermediate wells before unloading the grain
from the center well FIRST. This situation could result in structural damage to the
grain bin.