beautypg.com

Grain Systems Unload Augers PNEG-1049 User Manual

Page 25

background image

4. Assembly

PNEG-1049 10"-12" Commercial Bin Sweep Augers

25

27. Remove the two (2) 5/16" x 3/4" hex bolts and nylock nuts from the front of the belt guard. This will

allow access to the sheave and belts.

(See Figure 4U.)

Figure 4U Remove Belt Guard Hardware

28. Place the 1/4" square key on the keyway of the 3:1 aluminum enclosed drive input shaft. Place the

12" sheave onto the input shaft and key. The set screws of the sheave should be away from the
enclosed drive. Do NOT tighten the set screws. These will be adjusted after the motor and motor
sheave is in place.

(See Figure 4V.)

Figure 4V Sheave to Drive Assembly

29. Attach the motor (not supplied) to the top motor clips with the appropriate hardware (not supplied.)

30. Attach the motor sheave to the motor.