Transition installation (tr-4734), Assembly – Grain Systems PNEG-1510 User Manual
Page 75

9. Assembly
PNEG-1510 Top Dry 24', 30' and 36' Manual Batch
75
Transition Installation (TR-4734)
Before cutting the opening check that TR-4734 is the transition that was ordered.
When installing the GSI aeration transition, it will be necessary to field cut a hole into the bottom sidewall
ring (usually straight across from the unload auger).
for proper dimensions of
cut-out. The base angle will also need to be cut at entrance collar cut-out. Take note of the
showing the 1" dimension from bottom of entrance collar side bracket to concrete. This is important for
proper fit of transition.
NOTE: Entrance collar side bracket must be bolted on the inside of the bin sidewall.
Figure 9AA As Viewed from Inside Bin
Part #
Description
Qty
S-275
5/16"-18 x 3/4" Bin Bolt Grade 5
125
S-280
#10- 16 x 5/8" Self-Drilling Screw
10
S-3651
Tube Caulk - Gray Butyl #506-15
1
S-396
5/16"-18 Hex Nut Grade 2
125
S-7264
Spec Neoprene Seal Strip w/ ADH
10'
- PNEG-1890 (16 pages)
- PNEG-595 (26 pages)
- PNEG-1472 (30 pages)
- PNEG-897 (58 pages)
- PNEG-838 (4 pages)
- PNEG-1755 (36 pages)
- PNEG-524 (24 pages)
- PNEG-1080 (2 pages)
- PNEG-728 (47 pages)
- PNEG-673 (57 pages)
- PNEG-1717 (88 pages)
- PNEG-823 (42 pages)
- PNEG-630-6S (23 pages)
- PNEG-1876 (80 pages)
- PNEG-102 (2 pages)
- PNEG-366 (51 pages)
- PNEG-1626 (1 page)
- PNEG-1874 (78 pages)
- PNEG-1798 (34 pages)
- PNEG-1927 (4 pages)
- PNEG-924 (2 pages)
- PNEG-582 (26 pages)
- PNEG-012 (46 pages)
- PNEG-1797 (86 pages)
- PNEG-546 (26 pages)
- PNEG-951 (102 pages)
- PNEG-1650 (92 pages)
- PNEG-1649 (50 pages)
- PNEG-1376 (88 pages)
- PNEG-361 (46 pages)
- PNEG-338 (32 pages)
- PNEG-1276 (78 pages)
- PNEG-1283 (22 pages)
- PNEG-1089 (14 pages)
- QSG-001 (2 pages)
- PNEG-950 (96 pages)
- PNEG-1590 (3 pages)
- PNEG-501 (33 pages)
- PNEG-1447 (68 pages)
- PNEG-707GSI (446 pages)
- PNEG-349 (32 pages)
- PNEG-236 (22 pages)
- PNEG-743 (16 pages)
- PNEG-900 (54 pages)
- PNEG-1935 (92 pages)