beautypg.com

30' leveling band location – Grain Systems PNEG-1510 User Manual

Page 51

background image

8. Installation

PNEG-1510 Top Dry 24', 30' and 36' Manual Batch

51

30' Leveling Band Location

Add leveling bands as shown in the relevant drawings

on Pages 51-52

.

Use two (2) 5/16" x 3/4" bin bolts to join band sections. Also use (2) 5/16" x 3/4" bin bolts to attach bands
to posts. Note that band sections connect to each other only at endmost holes. Due to the odd
number of rafters leveling band posts spacing is not equal on the inner and outer leveling bands
.

Inner Leveling Bands

Figure 8R

Middle Leveling Bands

Figure 8S