beautypg.com

Dump hopper installation floor sheet installation, Dump hopper installation, Floor sheet installation – Grain Systems PNEG-1510 User Manual

Page 42: Installation

background image

8. Installation

42

PNEG-1510 Top Dry 24', 30' and 36' Manual Batch

Dump Hopper Installation

Pre-assemble the dump hoppers, dump brackets and flashing angles to the floor sheets. Place a dump
hopper under the floor sheet and align it with the pre-punched large hole. Place a flashing angle on top of
the sheet across the outer edge of the hopper entrance with the interior of the angle facing the sidewall.
Screw down through the angle, sheet and hopper with 5/16" x 3/4" self-tapping screws.

(See Figure 8E.)

Figure 8E

Floor Sheet Installation

Now the assembled sheets can be placed over the rafter framework. As the sheets are placed and
overlapped they are to be screwed down to the rafters using 5/16" x 3/4" self-tapping screws, leaving the
third and eighth holes empty.

(See Figure 8F.)

Figure 8F

Nominal Diameter

of Tank (Ft.)

# of Holes to Leave Empty

24'

Third and Eighth Holes

30'

Fourth, Seventh and Tenth Holes

36'

Third, Sixth, Tenth and Twelfth Holes