Flashing bolt installation, Eave flashing installation – Grain Systems PNEG-1510 User Manual
Page 46
8. Installation
46
PNEG-1510 Top Dry 24', 30' and 36' Manual Batch
Flashing Bolt Installation
Install the eave flashing bolts (5/16" x 1-1/4") through the sidewall and tighten first nut. Note at the vertical
sidewall seams, one bolt is turned around to avoid interference with eave flashing.
Figure 8J
Eave Flashing Installation
Install the eave flashing centered on the floor sheet (one per) with the bent edge towards the sidewall
install a fender washer (S-3671) and nut. Screw the flashing to the flashing angle at the dump hopper
opening with five (5) #10 self-drilling (S-280) screws and screw the flashing pieces together where they
overlap with three (3) #10 self-drilling (S-280) screws.
Figure 8K
Left bolt on the each vertical sidewall seam
level with the eave flashing bolts (as viewed
from inside the bin) is to be installed bolt in,
nut out, as shown in
.
Flashing Attachment
1) Sidewall
2) Flashing (TD-100648)
3) Floor sheet
4) 5/16" x 1-1/4" Bin bolt
Note that there is a nut in
between the sidewall sheet
and the flashing sheet.