New lev installs split p4of6 – Atdec Levitate L-PW Installation manual User Manual
Page 4
Step 6. Adjust Spring Assistance
Step 7. Cable Management
(How do I remove Cable Covers? See final page for help)
Starting with the Lower Arm, tighten the Tension Bolt until the arm comfortably holds its
position wherever it is moved.
Once satisfied, repeat the process for the Upper Arm.
TIP: FOR MULTIPLE INSTALLATIONS ONLY.
When tensioning the Upper and Lower Arms take
note of the Visual Gauge on each arm.
This will help when installing multiple Levitate
products supporting the same weight monitors.
TIP: DO NOT OVER TENSION.
Both arms should move freely, and support
the weight of the monitor in any position.
Upper Arm
Lower Arm
Lower Arm
Tension Bolt
Upper Arm
Tension Bolt
Visual Gauge
1. Position the Arm Assembly for MAxIMUM
REACH OR COMPACT use depending on your
monitor requirements.
3. Push cables under retaining clips on the Upper and Lower
Arms to hold the cables in position.
4. Install Cable Covers on both sides of the Upper and Lower
Arms.
NOTE: The Cable Covers are different for left and right sides.
PUSH
PUSH
LESS
TENSION
(anti-clockwise)
MORE TENSION
(clockwise)
TIP: If necessary gently flex clips
A and C to hold the cable.
A
B
C
MAxIMUM REACH
COMPACT
2. Route cables along the length of the Arm
Assembly and connect to the monitor.
TIP: Leave enough slack in the cables to
allow full movement at the joints.
TIP: If cable plugs are too big to fit through
the joints, route the cables on the outside.
OR