Installation guide, Safety, Installation – Veris Industries H704-42_1(H)(E) Install User Manual
Page 3

6%2)3
H704
INSTALLATION GUIDE
Z202366-0M
page 3
©2008 Veris Industries USA 800.354.8556 or 503.598.4564 / [email protected]
02081
1. Inspect the Mounting Bracket Kit. The acquisition and interconnection boards are
mounted to the bracket at the factory.
safety
UL listed under standard 508 as an "open type device."
Installation category: CAT II or CAT III
Critical components evaluated to UL 1950.
The H704 Series must be installed in as appropriate electrical and fire enclosure per
local regulations.
For use in a Pollution Degree 2 or better environment only.
A Pollution Degree 2 environment must control conductive pollution and the
possibility of condensation or high humidity. Consideration must be given to the
enclosure, the correct use of ventilation, thermal properties of the equipment and
the relationship with the environment.
This symbol indicates an electrical shock hazard exists.
Documentation must be consulted where this symbol is used
on the product.
installation
11.375"
(289 mm)
1.12"
(28 mm)
5.75"
(146 mm)
Data Acquisition Board
Mounting Bracket
Data Acquisition Board
19.5
495
1.0
25
0.75
19
Side View
1.3
33
0.4 opening
10.16
0.75 on center
19
1.2
31
20.31
515
“Right” strip shown
50A Solid-Core CT Strips
19.5"
(241 mm)
0.75" on center
(19 mm)
0.35" opening
(9 mm)
1.0"
(26 mm)
24.0"
0.35" opening
1.0"
1.0" on center
H704-42
H704-42/1
H704-42
H704-42/1
H704-42(H)
100A Solid-Core CT Strip