Veris Technologies OpticMapper - Operating Instructions User Manual
Page 13
Pub.# OM17-OpticMapper
3-3
Operation:
1) The remote control offers simple operation of the power unit. Push button to raise and lower
Route to prevent damage of cable. Never engage power unit with hoses disconnected
– if
so, you may to need to bleed pressure as described below.
2) Be sure to lower the unit only as deep as needed to obtain proper penetration of all six coulters.
Use depth collars provided to set desired operational depth.
3) Due to the design of the implement, it is not necessary to raise the unit during field turns.
4) Prior to road transport, always install the transport lock channel on the cylinder rod.
5) To disconnect the implement from the power unit, install the transport lock and lower the
implement until it rests on the lock. Momentarily bump the control switch upward to relieve
system pressure and disconnect the hoses. Try not to disconnect under pressure, as it will be
difficult to re-connect.
6) Periodically check the fluid level of the reservoir with the implement in the lowered position. It
should be roughly 2” from top of reservoir, with the cylinder rod in the retracted position. Unit is
filled with Mobil 424 hydraulic fluid, and should be filled with compatible fluids of viscosity index
between 100 and 400 ssu.
7) Keep couplers as free of contaminates as possible, and install rubber plugs and caps when unit
is not in use.