beautypg.com

6 state graph of the start-up phases – AASTRA SIP-DECT (Release 1.8)-Installation- and Administration Guide EN User Manual

Page 27

background image

Installation, Administration and Maintenance

Aastra

depl-0900/0.4

Page: 27 (104)

3.1.6

State graph of the start-up phases

Start-up

wait for link up

LED RED ON

retry

Wait for 60 seconds; listen
for local configuration

LED red
flashing 0,25 Hz

Application

Init

Application

Connect to OMM

Application

Synchronize DECT

Application

Up & running

LED green

flashing 2 seconds

on / 50ms off

LED green

LED green

flashing 1 Hz

LED green

flashing (0,5 Hz)

TFTP

File download

LED red

flashing 2,5 Hz

DHCP no answer / offer not o.k.

TFTP failed

Connection attempt to OMM failed

Failure, i.e. connection to OMM lost

Failure, i.e. connection to OMM lost

DHCP

wait for reply

LED orange

DHCP no answer; offer not o.k.

(try 3 minutes)

Local

configuration

yes

no

Local conf. Start-up

LED orange

Local

configuration

yes

no

Init failed

Change of the local configuration

BOOTER

Kernel

Listen for local configuration in every state

*

DHCP

wait for reply

LED red

flashing 0,5 Hz

Wait for 6 seconds; listen
for local configuration

LED RED ON