beautypg.com

Concentric termination assembly, Gv90, Boiler manual – Weil-McLain GV90+ User Manual

Page 47: Sidewall or vertical)

background image

Part number 550-142-054/0411

47

GV90+

gas

-

fired

water

boiler

— Boiler Manual

Concentric termination assembly

(sidewall or vertical)

Figure 58

3” PVC concentric termination assembly — DO NOT

attach the rain cap until the termination has been

inserted through the roof or wall and all supports have

been installed.

Assembling concentric termination

1. See Figure 58, page 47 for the details of the termi-

nation assembly.

2. Prepare the bird screen (purchased separately if

not included with the kit). Cut the bird screen to

size if required. If the bird screen must be trimmed,

cut the bird screen to fit the outside diameter of

the PVC inner pipe supplied with the termination

kit.

3. Partially assemble the vent termination kit in the

sequence shown in Figure 58, page 47.

DO NOT

install the rain cap and bird

screen until the assembly has been in-

serted through the roof (or sidewall)

and all supports have been installed.

Follow instructions to cover the end of

the assembly with plastic before inserting

through the roof penetration to prevent

debris from blocking the air passages.

4. Use the following procedures to prepare termina-

tion components and cement together.

5. Deburr inside and outside of pipe ends.

6. Chamfer outside of each pipe end to ensure even

cement distribution when joining.

7. Clean all pipe ends and fittings.

8. Dry thoroughly.

9. Dry assemble entire vent or air piping to ensure

proper fit before assembling any joint.

10. For each joint:

a. Handle fittings and pipes carefully to prevent

contamination of surfaces.

b. Apply primer liberally to both joint surfaces —

pipe end and fitting socket.

c. While primer is still damp, lightly apply ap-

proved cement to both surfaces in a uniform

coating.

d. Apply a second coat to both surfaces. Avoid

using too much cement on sockets to prevent

cement buildup inside.

e. With cement still wet, insert pipe into fit-

ting, twisting ¼ turn. Make sure pipe is fully

inserted.

If necessary, you can shorten the lengths

of the inner and outer pipes for a shorter

finished assembly. But you must ensure

the pipes butt correctly at both ends. Fail-

ure to properly assemble the concentric

termination can result in flue gas recir-

culation, causing possible severe personal

injury or death.