beautypg.com

Install water piping, Gv90, Boiler manual – Weil-McLain GV90+ User Manual

Page 16

background image

Part number 550-142-054/0411

GV90+

gas

-

fired

water

boiler

— Boiler Manual

16

Figure 17

Baseboard system — circulator zoning

Baseboard system piping —

CIRCULATOR zoning (primary/secondary)

Apply Figure 17 for circulator zoning on systems using baseboard

heaters. The heaters can be any baseboard style, including finned tube

or cast iron.

Zoning with circulators

— The GV90+ internal system

circulator cannot be removed from the boiler for use as

one of the zone circulators. It must remain as shipped

from the factory to allow proper flow control inside the

boiler. You will need a circulator for each zone. Provide

circulator relays or circulator zone controller.

Baseboard system piping —

ZONE VALVE zoning (direct connection)

The boiler internal circulator can be used to circulate many zone-valve

zoned systems as shown in Figure 18, page 17 for application on systems

using baseboard (finned tube or cast iron).

DO NOT apply this piping when using a GV90+6 — the internal

circulator cannot supply enough flow to the system

.

When applying Figure 18, page 17

,

DO NOT exceed the limits

shown in Figure 19, page 17

.

For systems requiring higher flow or head loss, apply the

suggested piping of Figure 20, page 18, NOT that of Fig-

ure 18, page 17.

Balancing, when required

Substitute a memory-stop

valve for one of the isolation valves in each zone to use

the memory-stop valve for balancing flow as well as

isolation.

Zoning with zone valves

Provide a separate 24-volt

transformer to power the zone valves. Size the trans-

former to handle the total rated load of all connected zone

valves. Alternatively, use a zone valve zone controller.

Applying Figure 18, page 17

1. Figure 18, page 17 and Figure 19, page 17 provide guidelines for

checking whether the GV90+ internal circulator can provide suffi-

cient flow when directly connected to a two-pipe baseboard system.

The outputs of GV90+ boilers are all too high for con-

nection to a single-loop series-loop system. To apply to

an existing series loop system, the system must be fitted

with trunk lines to convert to a split-loop system. Pro-

vide either one or two trunk lines to meet the minimum

number of circuites and maximum loading per circuit

given in Figure 19, page 17.

2. The system pipe sizing must be no smaller than shown in the

Legend for Figure 18, page 17.

3. Values shown for maximum circuit lengths, maximum load per

circuit and the maximum feet baseboard per circuit are limits that

ensure the internal circulator will have sufficient head to provide

the flow needed for each circuit.

MINIMUM

Boiler loop pipe size

GV90+3/4
GV90+5/6

1”

1¼”

Legend

1 Isolation valves

2 Automatic air vent (with

diaphragm-type expan-
sion tank), or connect to
tank fitting (closed-type
expansion tank).

3 Diaphragm- or bladder-

type expansion tank, if
used. (For closed-type
expansion tank, pipe
from top of air separa-

tor to tank fitting as in
Figure 15, page 14.)

5 Zone circulator
6 Flow/check valve
7 Hose bibb purge valve
8 Boiler pressure/tempera-

ture gauge

16 Cold water fill line — see

Figure 15, page 14 for
typical components

Install water piping

(continued)