Vent termination requirements – Weil-McLain GV90+ User Manual
Page 35

Part number 550-142-054/0411
35
GV90+
gas
-
fired
water
boiler
— Boiler Manual
Vent termination requirements
Figure 41
The vent termination must be located to meet all requirements below (also applies to vertical vent terminations).
For Canadian installations, defer to the requirements of CSA B149.1 or B149.2 Installation Code.
See also other documents in the category Weil-McLain Water boiler:
- BMC (32 pages)
- GOLD CGt SERIES (3 pages)
- SERIES 2 LGB-8 (11 pages)
- LGB-23 (12 pages)
- ULTRA 105 (60 pages)
- ULTRA 310 (1 page)
- -105 (28 pages)
- 550-141-830/1202 (12 pages)
- GV Series 4 (8 pages)
- GAS CONVERSION KIT GV-4 510-811-605 (2 pages)
- Ultra Series 2 (2 pages)
- ULTRA 155 (2 pages)
- GOLD CGI-4E (68 pages)
- SB0002 (2 pages)
- EGH-105 (36 pages)
- AQUA PLUS GL-E223-ADOC 0311 (44 pages)
- GOLD CGS 550-110-260/0508 (64 pages)
- BCP-8S (28 pages)
- LGB-4 (8 pages)
- HE II Boiler (5 pages)
- LGB-6 (12 pages)
- C-1013 (24 pages)
- CGs (24 pages)
- P-SGO (4 pages)
- GOLD CGS-4E (64 pages)
- Oil-Fired Water Boiler (4 pages)
- LGB (24 pages)
- Gold CGa (68 pages)
- GOLD CGs (16 pages)
- PLUS LINE PLUS-E017-A/1206 (68 pages)
- WGO (12 pages)
- PFG (24 pages)
- PEG-30 THRU -65 (24 pages)
- LGB-20 (12 pages)
- Boiler (32 pages)
- 382-200-300 (2 pages)
- Ultra Electric Water Heater (12 pages)
- GOLD CGI SERIES 2 (68 pages)
- 88 (40 pages)
- PFG Series (3 pages)
- EGH-85 (16 pages)
- Gold GV 3 Series (16 pages)
- SERIES 7 PFG (16 pages)
- FLAME GUARDIAN WMBC-1A (11 pages)