5 coupling and tube assembly, 50 mm – Roberts Gorden Vacuum Assisted Linear User Manual
Page 37

SECTION 7: U-T
UBE
H
EATER
I
NSTALLATION
31 of 75
Step 7.5 Coupling and Tube Assembly
Step 7.5.1 Coupling and Tube Assembly (Continued)
Tube
Tube
Orient coupling so that
the impact block is in the
2:00 or 10:00 oclock
positions
Closed
Open
Tab
76 mm to
101 mm
Slide Bar
Coupling
Wide End
Coupling
Tube
Slide Bar
A
Close coupling
with tab.
B
Start slide bar/coupling lock
onto coupling.
C
Insert tubes into coupling.
D
Tighten coupling to join tubes.
Description
Part Number
Coupling
01329600
Slide Bar/Coupling Lock
01329700
Tube
91409408
Incorrect Slide Bar
position
Correct Slide Bar
dimensions
± 50 mm
Drive slide bar until tight.
End of slide bar should be
within tolerance listed below.
Step 7.5 A - D until all tubes are assembled.
Tighten slide bar as shown below.
This manual is related to the following products:
- Double Linear U-Tube and Multi-Burner Gas Fired Heating Systems BH15ST BH20ST and Multi-Burner Gas Fired Heating Systems BH45UT/EF and Multi-Burner Gas Fired Heating Systems BH70DL/EF and Multi-Burner Gas Fired Heating Systems BH25ST/EF and Multi-Burner Gas Fired Heating Systems BH45ST/EF and Multi-Burner Gas Fired Heating Systems BH25UT/EF and Multi-Burner Gas Fired Heating Systems BH50UT/EF and Multi-Burner Gas Fired Heating Systems BH40ST/EF and Multi-Burner Gas Fired Heating Systems BH40DL and Multi-Burner Gas Fired Heating Systems BH60DL/EF and Multi-Burner Gas Fired Heating Systems BH30DL and Multi-Burner Gas Fired Heating Systems BH40UT/EF and Multi-Burner Gas Fired Heating Systems BH15UT and Multi-Burner Gas Fired Heating Systems BH30ST/EF and Multi-Burner Gas Fired Heating Systems BH50ST/EF BH55ST and Multi-Burner Gas Fired Heating Systems BH35ST/EF