Installing the server and connecting the peripheral devices
Standard 1.0
54
CallPilot
Installing the server
Introduction
Before you install the 1001rp server, ensure that the chosen location meets
the requirements identified on the “Site inspection checklist” provided in
Part 1 of the CallPilot Installation and Configuration binder.
To install the server
Place the 1001rp server in its chosen location. If you are installing the server
in a rack cabinet, follow the instructions that are provided with the slide
rails.
Connect peripheral devices as described in the remainder of this chapter.
ATTENTION
Do not connect the server to power yet.