beautypg.com

Unpacking the rmx, Unpacking the rmx 1500, Unpacking the rmx 2000 – Polycom DOC2560C User Manual

Page 37: Unpacking the rmx -5

background image

Polycom RMX 1500/2000/4000 Getting Started Guide

2-5

Unpacking the RMX

Unpacking the RMX 1500

To unpack and lift the RMX 1500:
1

When you receive the RMX 1500 packing case, inspect the equipment
for damage and verify that the components match the packing slip.

2

Open the top cover of the packing case.
Two boxes are placed on the top Stratocell®, labelled:

Installation Accessories. This kit contains the power cables and a
Disk-on Key (DOK).

Rack Installation Accessories. This kit contains the accessories for
the 19”/23” racks as follows:

Unpacking the RMX 2000

To unpack and lift the RMX 2000:
1

When you receive the RMX 2000 packing case, inspect the equipment
for damage and verify that the components match the packing slip.

2

Open the top cover of the RMX 2000 packing case and make sure that
the Installation Accessories kit contains the power cables and a USB
Key.

3

Remove the top cover, lift the RMX 2000 from the package and place
it on a flat surface.

Write down the RMX’s serial number that is on a sticker on the back of the unit.
It will be needed for product registration later in the process.

Table 2-2

19” & 23” Rack Installation Accessories Package

Item ID

Description

Quantity

MEC2791A-L0

Chassis runner (60cm in length) for
rack installation on the RMX 1500.
19”/23” racks both require that these
runners be installed on the rack.

2

Write down the RMX’s serial number that is on a sticker on the back of the unit.
It will be needed for product registration later in the process.