State Industries SBD85 500 User Manual
Page 54
SBD TANK TYPE HEATERS
SERVICE HANDBOOK
Technical Training Department
Ashland City, TN ©2003
53
V. WATER
PIPING
Is
the
system
properly
sized?
yes
no
Is
the
system
properly
installed?
yes
no
Are
there
any
water
leaks?
yes
no
Does the installation have a recirculating system?
yes
no
If
so,
is
it
operational?
yes
no
VI.
PROPER SEQUENCE OF OPERATION
During
standby
does
damper
close
on
standby?
yes
no
During
standby
is
pilot
flame
off? yes
no
On a call for heat does thermostat close?
yes
no
On a call for heat does damper open completely?
yes
no
Does
sparking
begin
at
pilot?
yes
no
Is
pilot
flame
established?
yes
no
If
so,
does
sparking
stop?
yes
no
Does
main
burner
ignite? yes
no
Does
the
thermostat
satisfy?
yes
no
Does
damper
close?
yes
no
Comments:
VII. SAFETY
A.
Gas
Does pilot flame prove before main burner ignites?
yes
no
Does damper blade fully open before ignition sequence occurs?
yes
no
Is
burner
cover
plate
in
place?
yes
no
Is
burner
floor
shield
in
place?
yes
no
Does IID lockout occur after 30 sec. trial for ignition? (Propane models only)
yes
no
B. Water Temperature
Is the thermostat adjusted to the lowest
acceptable
temperature? yes
no
Does
the
installation
have
a
mixing
valve?
yes
no
If
so,
is
it
operational?
yes
no
What is the outlet temperature of the mixing valve?
Is a properly rated temperature and pressure relief valve installed?
yes
no
C.
Electrical
Is the 120 VAC electrical power supply
properly
wired?
yes
no
Are all the SBD control covers in place?
yes
no
Is the 120 VAC electrical power supply
properly
fused?
yes
no
D.
Flammables
Are flammable materials located in the area of the water heater?
yes
no
Are flammable vapors located in the area of the water heater?
yes
no
(This service checklist may be photo copied to assist with SBD service call.)