beautypg.com

State Industries SBD85 500 User Manual

Page 22

background image

SBD TANK TYPE HEATERS

SERVICE HANDBOOK

Technical Training Department

Ashland City, TN ©2003

21

STEP 3

TEST HIGH LIMIT RIGHT TERMINAL

STEP 3. TO TEST HIGH LIMIT RIGHT TERMINAL. Ensure that the jumper wire
between the high limit and thermostat is connected, and the damper motor power line is
connected. Test for 24 VAC between the high limit right terminal and ground.
IF THEN
The meter does not read 24 VAC:

Push the reset button and redo the test (storage
water temperature below 185 degrees).

The meter reads 24 VAC:

Go to step 4.


After Push in Reset - 24 VAC is now present

Reasons For Resetting

Condition

Cause

Solution

High limit open

Never set on initial
installation

Push high limit button

Excessive water temperature

Faulty thermostat

Replace dual control

Heater shut down before
reaching thermostat setting

Faulty high limit

Replace dual control

Note: The right terminal of the high limit has a jumper wire connected to the left terminal of the
thermostat. There is also a black wire connecting to the damper motor assembly. This black

wire

supplies power to the motor to close the damper during periods of standby.

Black-To

Damper Motor

High Limit (ECO)

Reset Button

High

Limit/Thermostat

Jumper Wire

Temperature

Adj. Dial

This manual is related to the following products: