beautypg.com

State Industries SBD85 500 User Manual

Page 39

background image

SBD TANK TYPE HEATERS

SERVICE HANDBOOK

Technical Training Department

Ashland City, TN ©2003

38

STEP 17

IID MODULE TEST






Pilot is lit - Sparking has stopped.

STEP 17. IID MODULE TEST (Power to the Main Valve).
Using a multimeter, test for
24 VAC between terminal MV on the IID and 24V (GND).

IF THEN
24 VAC is not present:

Replace the IID module. Conduct Step
18 before applying power to
replacement module.

24 VAC is present:

Go to step 18.

This manual is related to the following products: