beautypg.com

State Industries SBD85 500 User Manual

Page 32

background image

SBD TANK TYPE HEATERS

SERVICE HANDBOOK

Technical Training Department

Ashland City, TN ©2003

31

STEP 11

WIRE HARNESS TEST





STEP 11. WIRE HARNESS TEST.
Test for 24 VAC between terminal 24V on the IID
module, and 24V GND.

IF THEN
24 VAC is not present:

Check the wiring harness.

24 VAC is present:

Go to step 12.

Note: This test may be easier to conduct by removing the red wire from the IID terminal. Test for 24
VAC between the red wire and ground. Reconnect the red wire to the 24V terminal after the test.


This manual is related to the following products: