beautypg.com

Sub-Zero 427R User Manual

Page 54

background image

Installation Checklist

54

Complete the Installation

For framed, overlay and flush inset applications, follow

these steps to complete the installation. Before installing

the kickplate, be sure to reinstall the drain pan. Once the

drain pan is in place, screw the kickplate the to brackets

attached to the inside surface of each roller base. Reinstall

the grille following the instructions on page 37. Turn power

back on to the electrical outlet.

Installation Checklist

The importance of the installation of the Sub-Zero wine

storage unit cannot be overemphasized. Proper installa-

tion is the responsibility of the selling dealer or installer.

IMPORTANT NOTE:

To ensure a safe and proper installa-

tion, the following checklist should be completed by the

installer to ensure that no part of the installation has been

overlooked.

Any questions or problems regarding the installation

should be directed to your authorized Sub-Zero dealer or

Sub-Zero customer service at 800-222-7820. You may

also check the contact & support section of our website,

subzero.com.

INSTALLATION CHECKLIST

Has the packing material been removed?

Turn the unit on. Is it operating properly?

If not, is the unit plugged in? Is the control turned on?

Have the anti-tip brackets been installed securely and

properly engaging the unit?

Is the unit leveled properly on a solid, level floor?

Is the kickplate installed?

Has the drain pan been installed properly (WS-30)?

Are panels attached securely and properly aligned?

Has the door been aligned for proper appearance and

operation?

Has the unit been properly anchored to the opening?

Does the 90° door stop need to be installed?

Does your customer understand the unit’s operation?

Have you given your customer the warranty package?

Have any installation or service problems been noted

on the product registration card? Has the registration

card been mailed in?

Has the stainless steel door been inspected for any

imperfections? This is to be done by the dealer or

installer with the customer upon completion of the

installation. Stainless steel panels are covered by a

limited 60-day parts and labor warranty for cosmetic

defects.

This manual is related to the following products: