Installation, Unpacking checklist – Sharp UX-340LM User Manual
Page 11
9
1. Ins
tall
a
tion
1. Installation
Unpacking Checklist
If any are missing,
contact your dealer
or retailer.
Before setting up, make
sure you have all of the
following items.
Original
document
support
Handset
Handset
cord
Gears (4)
Imaging film
(initial starter roll)
Paper tray
extension
Rapid key
labels
Operation
manual
Telephone
line cord
Imaging
film cartridge
Points to keep in mind when setting up
Do not place the
machine in direct
sunlight.
Do not place the
machine near
heaters or air
conditioners.
Keep dust away from
the machine.
Keep the area
around the
machine clear.
About condensation
If the machine is moved from a cold to a warm place, it is possible that condensation
may form on the scanning glass, preventing proper scanning of documents for
transmission. To remove the condensation, turn on the power and wait
approximately two hours before using the machine.
all_ux340lm.book Page 9 Tuesday, November 28, 2000 3:09 PM