Removing sfp modules, Installing fiber-optic cables, Removing – IBM Partner Pavilion DS4100 User Manual
Page 80: Modules, Installing, Fiber-optic, Cables, Unlocking, Module, Latch
Removing
SFP
modules
To
remove
the
SFP
module
from
the
host
port,
perform
the
following
steps.
Attention:
To
avoid
damage
to
the
cable
or
to
the
SFP
module,
make
sure
you
unplug
the
LC-LC
fibre
channel
cable
before
you
remove
the
SFP
module.
1.
Remove
the
LC-LC
fibre
channel
cable
from
the
SFP
module.
For
more
information,
see
2.
Unlock
the
SFP
module
latch:
v
For
SFP
modules
that
contain
plastic
tabs,
unlock
the
SFP
module
latch
by
pulling
the
plastic
tab
outward
10°,
as
shown
in
v
For
SFP
modules
that
contain
wire
tabs,
unlock
the
SFP
module
latch
by
pulling
the
wire
latch
outward
90°,
as
shown
in
3.
With
the
SFP
latch
in
the
unlocked
position,
extract
the
SFP
module.
v
For
SFP
modules
that
contain
plastic
tabs,
slide
the
SFP
module
out
of
the
port.
v
For
SFP
modules
that
contain
wire
tabs,
grasp
the
wire
latch
and
pull
the
SFP
module
out
of
the
minihub
port.
4.
Replace
the
protective
cap
on
the
SFP
module.
5.
Place
the
SFP
module
into
a
static-protective
package.
6.
Replace
the
protective
cap
on
the
port.
Installing
fiber-optic
cables
To
connect
the
fiber-optic
cables,
perform
the
following
steps.
Protective cap
SFP module
10
o
Plastic tab
F10ug009
Figure
36.
Unlocking
the
SFP
module
latch
-
plastic
variety
Protective cap
SFP module
90
o
Wire tab
F10ug010
Figure
37.
Unlocking
the
SFP
module
latch
-
wire
variety
48
IBM
TotalStorage
DS4100
Storage
Server:
Installation,
User’s,
and
Maintenance
Guide