beautypg.com

Removing sfp modules, Installing fiber-optic cables, Removing – IBM Partner Pavilion DS4100 User Manual

Page 80: Modules, Installing, Fiber-optic, Cables, Unlocking, Module, Latch

background image

Removing

SFP

modules

To

remove

the

SFP

module

from

the

host

port,

perform

the

following

steps.

Attention:

To

avoid

damage

to

the

cable

or

to

the

SFP

module,

make

sure

you

unplug

the

LC-LC

fibre

channel

cable

before

you

remove

the

SFP

module.

1.

Remove

the

LC-LC

fibre

channel

cable

from

the

SFP

module.

For

more

information,

see

“Handling

fiber-optic

cables”

on

page

45.

2.

Unlock

the

SFP

module

latch:

v

For

SFP

modules

that

contain

plastic

tabs,

unlock

the

SFP

module

latch

by

pulling

the

plastic

tab

outward

10°,

as

shown

in

Figure

36.

v

For

SFP

modules

that

contain

wire

tabs,

unlock

the

SFP

module

latch

by

pulling

the

wire

latch

outward

90°,

as

shown

in

Figure

37.

3.

With

the

SFP

latch

in

the

unlocked

position,

extract

the

SFP

module.

v

For

SFP

modules

that

contain

plastic

tabs,

slide

the

SFP

module

out

of

the

port.

v

For

SFP

modules

that

contain

wire

tabs,

grasp

the

wire

latch

and

pull

the

SFP

module

out

of

the

minihub

port.

4.

Replace

the

protective

cap

on

the

SFP

module.

5.

Place

the

SFP

module

into

a

static-protective

package.

6.

Replace

the

protective

cap

on

the

port.

Installing

fiber-optic

cables

To

connect

the

fiber-optic

cables,

perform

the

following

steps.

Protective cap

SFP module

10

o

Plastic tab

F10ug009

Figure

36.

Unlocking

the

SFP

module

latch

-

plastic

variety

Protective cap

SFP module

90

o

Wire tab

F10ug010

Figure

37.

Unlocking

the

SFP

module

latch

-

wire

variety

48

IBM

TotalStorage

DS4100

Storage

Server:

Installation,

User’s,

and

Maintenance

Guide