Replacing the ds4100 crus, Replacing, Ds4100 – IBM Partner Pavilion DS4100 User Manual
Page 61: Crus, Installing

2.
The
bezel
is
secured
to
the
front
of
the
DS4100
either
by
plastic
wingnuts
or
by
adhesive
tape.
Remove
and
discard
the
wingnuts
or
the
adhesive
tape.
The
bezel
should
remain
attached
to
the
DS4100
chassis.
Attention:
The
bottom
cross
member
of
the
bezel
has
a
tab
that
must
fit
beneath
the
DS4100
chassis
and
snap
into
place.
The
top
cross
member
of
the
bezel
has
a
recess
that
must
be
mated
with
a
metal
tab
on
the
bottom
of
the
DS4100
chassis.
3.
Secure
the
DS4100
to
the
rack
cabinet:
a.
Align
the
front
mounting
holes
on
each
side
of
the
storage
server
with
the
mounting
holes
on
the
front
of
the
support
rails.
b.
Install
the
bezel.
c.
Insert
an
M6
screw
into
the
mounting
hole
on
both
sides
of
the
front
of
the
unit
(see
Gently
tighten
the
screws
to
secure
the
bezel
and
the
front
of
the
DS4100
to
both
of
the
front
cabinet
rails.
Attention:
Do
not
overtighten.
If
you
overtighten
these
screws,
you
could
break
the
bezel.
d.
From
the
back
of
the
rack
cabinet,
insert
the
two
6/32
in.
screws
(
5
in
one
on
each
side,
in
the
holes
located
on
the
tab
on
each
side
of
the
unit.
Tighten
the
screws.
4.
Continue
with
one
of
the
following
actions:
v
If
you
did
remove
the
DS4100
CRUs
before
installation
(as
described
in
continue
with
v
If
you
did
not
find
it
necessary
to
remove
the
DS4100
CRUs
before
installation,
continue
with
Replacing
the
DS4100
CRUs
Use
the
following
procedures
to
replace
the
CRUs
in
the
DS4100
after
installation.
Front of Rack
f10ug051
Figure
17.
Installing
the
DS4100
Chapter
2.
Installing
the
storage
server
29