Connecting, Power, Cord – IBM Partner Pavilion DS4100 User Manual
Page 125: Connector

Statement
8:
CAUTION:
Never
remove
the
cover
on
a
power
supply
or
any
part
that
has
the
following
label
attached.
Hazardous
voltage,
current,
and
energy
levels
are
present
inside
any
component
that
has
this
label
attached.
There
are
no
serviceable
parts
inside
these
components.
If
you
suspect
a
problem
with
one
of
these
parts,
contact
a
service
technician.
1.
Ensure
that
the
ac
power
switch
is
off
on
the
power
supply
that
you
are
installing.
2.
Install
the
power
supply
in
the
storage
server,
as
follows:
a.
Slide
the
power
supply
into
the
storage
server.
Make
sure
that
the
lever
is
pulled
straight
out
as
you
slide
the
power
supply
into
the
storage
server.
b.
Close
the
lever
until
the
pull-ring
latch
locks
in
place.
Make
sure
that
the
lever
locks
into
place
in
the
storage-server
chassis.
3.
Wrap
the
strain-relief
clamp
around
the
power
cord
approximately
20
cm
(8
in.)
from
the
power-supply
connection
end.
Leave
some
slack
between
the
clamp
and
the
power-supply
end
of
the
power
cord.
4.
Replace
the
power-supply
nut
and
tighten
it
securely
to
secure
the
clamp
to
the
power
supply
unit.
5.
Connect
the
power
cord
to
the
AC
power
connector.
See
6.
Plug
the
power
cord
into
a
properly
grounded
electrical
outlet.
7.
Turn
on
the
power-supply
switch.
8.
DS4100
single-controller
storage
server
only:
If
you
have
replaced
a
working
(non-failed)
power
supply
on
a
DS4100
single-controller
storage
server,
turn
on
AC power
connector
AC power
switch
Strain-relief
clamp
Lever
-
f10ug027
Figure
69.
Connecting
the
power
cord
to
the
AC
power
connector
Chapter
5.
Installing
and
replacing
components
93