Honeywell GNS-XL User Manual
Page 271

7-5
GNS-X
L
Flight Management System AFIS Operation
Rev. 0
Oct/96
NOTE: Planned fields become
dashes when no planned data
is available for the current leg.
(Figure 7-4).
ACT: Actual
This column is GNS-X
L
data.
NOTE: Actual fields become
dashes when cursor is posi-
tioned over the leg identifiers.
(Figure 7-5).
F REM: Fuel Remaining
Planned: AFIS planned fuel
remaining at aircraft present
position based on DMU inter-
polated values.
Actual: The total fuel on board
as calculated by the GNS-X
L
.
NOTE: Field changes to F
REQ when cursor is positioned
over the leg identifiers
F REQ: Fuel Required
Planned: The AFIS planned fuel required to fly the leg displayed.
FF P/E: Fuel Flow per Engine
Planned: AFIS planned fuel flow per engine for leg displayed.
Actual: Total actual fuel flow divided by the number of engines. This
is an averaged quantity.
ETA: Estimated Time of Arrival
Planned: The sum of the AFIS planned time enroute for the leg dis-
played and the actual time of arrival over the previous waypoint.
Actual: The estimated time of arrival over TO waypoint based on
current groundspeed.
DIR TO
:
PSB
FL390
PLAN
ACT
F REM
------
11952
FF P/E
----
0
ETA
-----
05:26
TAS
---
300
GS
---
300
NAVIGATION 5/5
<
Figure 7-4
NAVIGATION 5/5
<
HEC:KVNY
FL390
PLAN
ACT
F REQ
375
------
FF P/E
625
----
ETE
0+16
-----
TAS
460
---
GS
448
---
Figure 7-5