beautypg.com

H. install vertical termination cap, J. install horizontal termination cap – Heat & Glo Fireplace RED40ST User Manual

Page 40

background image

Heat & Glo • RED40, RED40ST • 2155-900 Rev. P • 10/12

40

SCREWS

CAULK

STORM
COLLAR

(1 of 3)

Figure 10.15

TERMINATION CAP

H. Install Vertical Termination Cap

• Attach the vertical termination cap by sliding the inner

collar of the cap into the inner fl ue of the pipe section
while placing the outer collar of the cap over the outer
fl ue of the pipe section.

• Secure the cap by driving three self-tapping screws

(supplied) through the pilot holes in the outer collar of
the cap into the outer fl ue of the pipe (see Figure 10.15).

Important Notice: Heat shields may not be fi eld constructed.

I. Heat Shield Requirements for Horizontal

Termination

WARNING! Risk of Fire! To prevent overheating and fi re,
heat shields must extend through the entire wall thick-
ness.

DO NOT remove the heat shields attached to the

wall shield fi restop and the horizontal termination cap
(shown in Figure 10.16).

• Heat shields must overlap 1-1/2 in. (38 mm) mini-

mum.

There are two sections of the heat shield. One section
is factory-attached to the wall shield fi restop. The other
section is factory-attached to the cap. See Figure 10.16.

If the wall thickness does not allow the required 1-1/2 in.
(38 mm) heat shield overlap when installed, an extended
heat shield must be used.

• If the wall thickness is less than 4 in./102 mm, the heat

shields on the cap and wall shield fi restop must be
trimmed. A minimum 1-1/2 in. (38 mm) overlap MUST
be maintained.

• Use an extended heat shield if the fi nished wall thickness

is greater than 7-1/4 in. (184 mm).

Figure 10.16 Venting Through the Wall

Note: When using termination caps with factory-supplied heat
shield attached, no additional wall shield fi restop is required on
the exterior side of a combustible wall.

J. Install Horizontal Termination Cap

WARNING! Risk of Fire! The telescoping fl ue section
of the termination cap MUST be used when connecting
vent.

• 1-1/2 (38 mm) minimum overlap of fl ue telescoping

section is required.

Failure to maintain overlap may cause overheating and
fi re.

• Vent termination must not be recessed in the wall. Siding

may be brought to the edge of the cap base.

• Flash and seal as appropriate for siding material at

outside edges of cap.

• When installing a horizontal termination cap, follow

the cap location guidelines as prescribed by current
ANSI Z223.1 and CAN/CGA-B149 installation codes
and refer to Section 6 of this manual.

CAUTION! Risk of Burns! Local codes may require in-
stallation of a cap shield to prevent anything or anyone
from touching the hot cap.

NOTICE: For certain exposures which require superior
resistance to wind-driven rain penetration, a fl ashing kit and
HRC caps are available. When penetrating a brick wall, a
brick extension kit is available for framing the brick.

INTERIOR

HEAT SHIELD OR

EXTENDED

HEAT SHIELD

WALL SHIELD

FIRESTOP

HEAT SHIELD

1-1/2 IN. (38 MM) MIN.

OVERLAP

SHEATHING

SLIP SECTION

CAN BE EXTENDED

INNER VENT

OUTER VENT

EXTERIOR

• The extended heat shield may need to be cut to length

maintaining suffi cient length for a 1-1/2 in. (38 mm)
overlap between heat shields.

• Attach the extended heat shield to either of the existing

heat shields using the screws supplied with the extended
heat shield. Refer to vent components diagrams in the
back of this manual.

• Rest the small leg on the extended heat shield on top

of the pipe section to properly space it from the pipe
section.

This manual is related to the following products: