Offline/reset switch for the 2s4082-25 -6, Offline/reset switch for the 7s4280-19 -6 – Enterasys Networks 7S4280-19-SYS User Manual
Page 66

Overview of the NAC Controller PEP Shutdown Procedure
5-6 Troubleshooting
Overview of the NAC Controller PEP Shutdown Procedure
The chassis must shut down in an orderly fashion to ensure that the other devices on the network
are notified of the impending change. The devices can then make intelligent decisions and
stabilize the network before the change is made; thereby increasing network availability.
You can shut down a NAC Controller PEP in an operating N1 Chassis using the
OFFLINE/RESET
switch
. There are two procedures to shut down a chassis.
•
“Recommended Shutdown Procedure”
•
“Last Resort Shutdown Procedure”
Figure 5-2 OFFLINE/RESET Switch for the 2S4082-25
Figure 5-2 OFFLINE/RESET Switch for the 7S4280-19
Caution: Do not remove a NAC Controller PEP from an operating chassis system before reading
the following information and instructions.
Precaución: Antes de retirar los módulos DFE del chasis en funcionamiento, lea las siguientes
instrucciones y la información suministrada.
1 OFFLINE/RESET switch
1 OFFLINE/RESET switch