beautypg.com

Chapter 2 hardware installation – PLANET IPM-1200x Series User Manual

Page 15

background image

Chapter 2 Hardware Installation

Before you proceed with the installation, it is necessary that you have enough information

about the IP Power Manager.

Step 1 Attaching the Feet

The IP Power Manager comes with four feet or spacers that are attached to the bottom. Use

the four screws provided with the feet to attach the feet to the bottom of the IP Power

Manager as shown:

NOTE:

Users do not need to attach the feet if users are going to install the IP Power
Manager in a rack.

Step 2 Attaching the Ears

The IP Power Manager is designed to be placed in a rack arrangement and comes with two

ears (mounting brackets) that help users to move the device easily. Attach each ear with the

three screws provided in the package.












Step 3 Rack Mounting

The

IP Power Manager can be installed in most standard 19” (1U) racks. After attaching the

ears to each side of the device, position the device in the rack and align the holes in the ears

(mounting brackets) with the hole in the rack. Use the screws supplied with your racks to

tighten the ears (mounting brackets) to the rack.

Step 4 Making Connections

The IP Power Manager can be attached to twelve output devices whose power status can be

controlled remotely. It also supports an EMD (Environmental Monitoring Device) connecting

with sensors for detecting environmental conditions as well as digital outputs for enabling

devices with normally open or normally close conditions. Moreover, the IP Power Manager

supports a serial port (console) and Ethernet (LAN/WAN) connection that lets users control

- 10 -

User’s Manual of IPM-1200x Series