Settings menu, Hydro air stove principle diagrams – MCZ Duo HYDRO AIR User Manual
Page 23

1 2 3 4 5 6
7 8 9
NC
NO
C
23
12-SETTINGS MENU
Technical Dept. - All rights reserved - Reproduction is prohibited
HYDRO AIR STOVE PRINCIPLE DIAGRAMS
The following diagrams are to be used only as a guideline. For proper connection, always follow the notes for
the plumbing and heating installer. The plumbing system must meet local, regional or national requirements.
Installation and verification of operation is to be performed only by specialized, authorized personnel. The
manufacturer will not be held liable for noncompliance with the provisions listed above.
HEATING ONLY CONFIGURATION
BOILER CONFIGURATION
POS.1-2 = BOILER
PROBE/THERMOSTAT
This manual is related to the following products: