beautypg.com

Enterasys Networks C2K122-24 User Manual

Page 51

background image

Connecting to the Network

SecureStack C2 Installation Guide 3-21

3.

Verify that a link exists by checking that the Link/Activity LED is ON (solid green or 
blinking green). If the Link/Activity LED is OFF, perform the following steps until it is 
on:

a.

Verify that the cabling being used is Category 5 or better with an impedance 
between 85 and 111 ohms with a maximum length of 100 meters (328 feet). 

b. Verify that the device at the other end of the twisted pair segment is on and 

properly connected to the segment.

c.

Verify that the RJ45 connectors on the twisted pair segment have the proper 
pinouts and check the cable for continuity. Typically, a crossover cable is used 
between hub devices. A straight‐through cable is used to connect between 
switches or hub devices and an end user (computer). Refer to 

Figure 3‐13

 and 

Figure 3‐14

 for four‐wire RJ45 connections. Refer to 

Figure 3‐15

 and 

Figure 3‐16

 

for eight‐wire RJ45 connections.

d. Ensure that the twisted pair connection meets the dB loss and cable specifications 

outlined in the Cabling Guide. Refer to 

Related Documents

”  on page xvi for 

information on obtaining this document.

4.

If a link is not established, contact Enterasys Networks. Refer to 

Getting Help

” on 

page 1‐5 for details.

Repeat all steps above until all connections have been made.

Figure 3-13 Four-Wire Crossover Cable RJ45 Pinouts for 10/100BASE-TX

1 RJ45 switch port

3 RJ45-to-RJ45 crossover cable

2 Other device port

4 RX+/RX- and TX+/TX-connections

These connections must share a common color pair.

TX+

TX–

RX+

RX– 2

1

3

6

TX+

TX–

2

1

3

6

RX+

RX–

В

А

Б

Г