beautypg.com

9 periodic actions, 1 disassembling the protective cover – SMA MULTICLUSTER BOX 12 User Manual

Page 29

background image

SMA Solar Technology AG

9  Periodic Actions

Operating Manual

MC-BOX-12-3-20-BE-en-10

29

9 Periodic Actions

9.1 Disassembling the Protective Cover

Procedure:

1. Release all fastening screws in the protective cover (TX 30).

'$1*(5

Danger to life due to electric shock
High voltages are present in the Multicluster Box and the multicluster system. Touching live components can result in

death or serious injury due to electric shock.

• Disconnect the Multicluster Box and multicluster system from all voltage sources before carrying out any work on

the Multicluster Box (see Section 8, page 28).

&$87,21

Risk of burns due to hot components
Components and terminals inside the Multicluster Box can get hot during operation. Touching hot components can

cause burns.

• Prior to removing the protective cover, let the Multicluster Box cool down.