SMA Solar Technology AG

6  Electrical Connection

Operating Manual

MC-BOX-12-3-20-BE-en-10

25

Procedure:

1. Insert the control cables into the Multicluster Box (see Section 9.3.1, page 31).
2. Connect the control cables to the spring-cage terminals X107 (see Section 9.4.2, page 35). Make sure that the

poling of the terminals is correct.

6.9.4 Connecting the Control Cables to the Grid Connect Box

Cable requirements:

☐ Conductor material: copper
☐ Conductor cross-section: 1.5 mm² to 2.5 mm²

Procedure:

1. Insert the control cables into the Multicluster Box (see Section 9.3.1, page 31).
2. Connect the control cables to the spring-cage terminals (see Section 9.4.2, page 35).

X110:1,2: block of grounding contactor of Multicluster Box
X110:3,4: feedback from grid contactor of Grid Connect Box
X111:1-4: voltage measurement of Grid Connect Box
X111:6,7: block of generator contactor of Multicluster Box
X111:8,9: block of grid contactor of Grid Connect Box

3. Ensure that the insulated conductors are firmly in place.

6.9.5 Connecting the Control Cables to the NA Box

Cable requirements:

☐ Conductor material: copper
☐ Conductor cross-section: 1.5 mm² to 2.5 mm²

Procedure:

1. Insert the control cables into the Multicluster Box (see Section 9.3.1, page 31).
2. Connect the control cables to the spring-cage terminals (see Section 9.4.2, page 35).

X110:1,2: block of grounding contactor of Multicluster Box
X110:3,4: feedback from grid contactor of NA Box
X111:1-4: voltage measurement of NA Box
X111:6,7: block of generator contactor of Multicluster Box
X111:8,9: block of grid contactor 2 of NA Box
X111:11,12: block of grid contactor 1 of NA Box

3. Ensure that the insulated conductors are firmly in place.

Ground connection at terminals X110 and X111
If the control cable between Multicluster Box and Grid Connect Box contains a grounding conductor, the grounding

conductor terminal must not be connected on both sides.

Ground connection at terminals X110 and X111
If the control cable between Multicluster Box and NA Box contains a grounding conductor, the grounding conductor

terminal must not be connected on both sides.