2 enclosure openings in the floor – SMA MULTICLUSTER BOX 12 User Manual

Page 18

background image

6  Electrical Connection

SMA Solar Technology AG

18

MC-BOX-12-3-20-BE-en-10

Operating Manual

6.1.2 Enclosure Openings in the Floor

Figure 9: Overview of the enclosure openings

H

Grounding busbar X100

To connect the grounding conductors of the generator, the loads

and the PV system
If a Grid Connect Box or NA Box is installed, the corresponding

grounding conductor is also connected here.

I

Cable support rail

K

Terminal X104 with spring-cage

terminals L1, L2, L3 and N

To connect the line conductors and the neutral conductor of the

PV system

L

Terminal X103 with spring-cage

terminals L1, L2, L3 and N

To connect the line conductors and the neutral conductor of the

main distribution for loads

M

Terminal X102 with spring-cage

terminals L1, L2, L3 and N

To connect the line conductors and the neutral conductor of the

generator

N

Terminal X101 with spring-cage

terminals L1, L2, L3 and N

To connect the line conductors and the neutral conductor of the

Grid Connect Box or NA Box
If only the Multicluster Box is installed, these terminals are not

connected.

O

SIBUCTRL

RJ45 pin connectors for connecting the data cables

P

Fuses

To protect the internal cabling

Position

Designation

A

Base plate with membranes for inserting the power cables

B

Two-part cable feed-through for inserting the data cables

Position

Designation

Explanation

B

A