3 installation of the module – SMA 20000TL Installation User Manual
Page 15
SMA Solar Technology AG
5 Electrical Connection
Installation Manual
PCONTROLMOD-IA-en-15
15
5.3 Installation of the Module
5.3.1 Installing the Module in the Sunny Boy Smart Energy
Procedure:
2. Remove the display:
• Flip the display up.
• Remove the plug of the display ribbon cable
from the pin connector on the display
assembly.
• Flip the display down.
• Press the right-hand retainer outwards.
• Pull the display out of the right-hand retainer.
• Pull the display out of the left-hand retainer.
• Set the display aside in a safe place.
1.
Danger to life due to electric shock when opening the inverter
High voltages are present in the live components of the inverter. Touching live components
results in death or serious injury.
• Disconnect the inverter from all voltage sources on the AC and DC sides and open it
(see inverter manual). Observe the waiting time to allow the capacitors to discharge.