beautypg.com

Level 20 system power-on procedure, Chapter 4 installing the level 20 storage system – Grass Valley K2 Storage System Instruction Manual v.3.2 Nov.18 2008 User Manual

Page 170

background image

170

K2 Storage System Instruction Manual

July 15, 2008

Chapter 4 Installing the Level 20 Storage System

Level 20 system power-on procedure

Power on Level

Level 20 (iSCSI) K2

Storage System

Power on and verify

control point PC

.

Refer to

page 173

for procedures.

Power on and verify

HP ProCurve switch

.

Refer to

page 172

for procedures.

Power on and verify

RAID devices

.

Refer to

page 172

for procedures.

Elapsed time: 5 minutes

Elapsed time: 1 minute

Power on the

K2 Media Server

.

From the control point PC, at
the command prompt, ping
the K2 Media Server.

Power on

K2 Media Clients

and other

iSCSI clients

.

Begin record/play operations.

Yes

Power on optional

NH servers

, if any.

From the control point PC, at
the command prompt, ping
the K2 Media Server.

Yes

K2

Media Server

responds to ping?

Elapsed time:

3 minutes

No

K2 Storage System
power-on complete

K2

Media Server

responds to ping?

Elapsed time:

3 minutes

No

Begin FTP operations.