Retest period – Seaward PATGuard 3 User Manual
Page 79
PATGuard 3
79 / 153
Asset Detail Window - Advanced tab
Default Test Codes can also be entered to instruct your test instrument how to test this group of assets, if
your test instrument supports Test Codes. Please refer to your test instrument manual for more information
on Test Codes.
Retest Period
The Retest Period for Full Test and Formal Visual Test can also be set in the
Asset Details
window.
Asset Detail Window - Retest period
The options for Retest Period include:
•
No Re-test - no Retest Period is defined
•
User Defined - Retest Period can be manually entered in the
Asset Details
window and will
automatically be calculated from the last test date
•
Group Default - the Retest Period will be set based on the
Asset Group
the Asset belongs to
•
As Risk Assessment - the Retest Period will be set based on the results of a
PAT Risk Assessment
Asset Notes
You can add notes about an Asset to the Asset Details. To do this, click the Notes... button in the
Asset
Details
window. This will open the Asset Notes window.