functional test for cooling

mode.

1. Switch the supply voltage on.

2. Use the remote control to

switch on the unit and select

the cooling mode, maximum

fan speed and lowest target

temperature.

3. Measure and record all

the required values in the

commissioning report and

check the safety functions.

4. Check the control system

for the unit using the

functions described in the

chapter "Operation". Timer,

temperature setting, fan speeds

and switching to ventilation or

dehumidifying mode.

5. Check the correct function

of the float switch and

condensation pump by

pouring distilled water into the

condensation tray.

A bottle with a spout is

recommended for pouring the

water into the condensation

tray.

functional test for

heating mode.

(only on RXS.H)

1. Switch the supply voltage on.

2. Use the remote control to

switch on the unit and select

the heating mode, maximum

fan speed and highest target

temperature.

3. Measure and record all

the required values in the

commissioning report and

check the safety functions.

4. Check the control system for

the unit using the functions

described in the chapter

"Operation".

Timer, temperature setting, fan

speeds.

final tasks

Re-fit all the dismantled parts.

Familiarize the operator with

the system.

Commissioning

Unit dimensions

RXD 260 to 520

RXD 520

RXD 260, RXD 350

650

650

280

615

258

580

150

185

207

28

580

190

230 245

28

298

All values in mm

RXD 680, RXD 1200

1220

690

298

28

1110

100

100

250

250

195

810

580

615

Commissioning should only be
performed by specially trained
personnel and documented
after the certificate has been
issued.

Observe the manuals
for the indoor unit and
outdoor component when
commissioning the entire
system.

NOTE

Check that the stop valves
and valve caps are tight after
carrying out any work on the
refrigerant circuit. If necessary,
use appropriate sealant
products.