Commissioning

Commissioning should only be
performed and documented by
specially trained personnel.

When starting up the
complete system, observe
the instructions given in the
manuals for the indoor unit
and outdoor component.

NOTE

Final tasks

Re-fit all the dismantled parts.

Instruct the operator on how to
use the equipment.

Functional test for
cooling mode

1. Switch on the supply voltage

on.

2. Use the remote control to

switch on the unit and select
the cooling mode, maximum
fan speed and lowest target
temperature.

3. Measure and record all

the required values in the
commissioning report and
check the safety functions.

4. Check the indoor unit

control system using the
functions described in the
chapter "Operation". Timer,
temperature setting, fan speeds
and switching to ventilation or
dehumidifying mode.

Check that the stop valves
and valve caps are tight after
carrying out any work on the
refrigerant circuit. If necessary,
use appropriate sealant
products.

NOTE

5. Check the correct function

of the condensation pipe by
pouring distilled water into the
condensation tray.
A bottle with a spout is
recommended for pouring the
water into the condensation
tray.

23

Unit dimensions

We reserve the right to modify the dimensions and constructional design as part of the ongoing technical development process.

ATY 260 IT / ATY 350 IT

148

567

567

All values in mm

495

470

396

45

25

47

This manual is related to the following products: