Remko aty, Condensation connection – REMKO ATY 261 User Manual

Page 20

background image

Condensation connection

If the temperature falls below the
dew point, condensation will form
on the vaporiser of the indoor unit
during cooling.

The collection tray below the
vaporiser should be connected to
the drain.

The condensation pipe should
have a fall of min. 2 %. This
is the responsibility of the
customer.(Fig 10). If necessary,
fit vapour diffusion tight
insulation.

The condensation pipe from
the unit should run freely
into the drainage pipe. If the
condensation runs directly
into a sewer pipe, fit a trap to
prevent any unpleasant odours.

When operating the unit at
outdoor temperatures below
0 °C, ensure the condensation
pipe is laid to protect it
against frost. If necessary, fit
supplementary pipe heating.

Once the pipe has been laid,
check the condensation drains
off and permanently seal it.

The standard condensation hose is
for connection to the left or right
side (as viewed from the front).
Remove the plug when making the
connection.

10

Condensation connection

at least

2% fall

Condensation connection

right or left

Condensation connection

for indoor unit

40

45

65

50

The condensation pump
cannot be built into the unit.

NOTE

REMKO ATY

20