Minimum clearances

Observe the minimum clearances
to allow access for maintenance
and repair work and facilitate
optimum air distribution.

Connection options

The following connection options
are available for the condensation
pipes and control cables.

C

onnection options

4

1 Exit on wall, right
2 Exit through wall, right
3 Exit through wall, left
4 Exit on wall, left

Rear view

1

2

3

Minimum clearances

All values in mm

1000

1000

1000

1000

300

Important points prior to
installation

When installing a complete
system, take into account the
manuals for the indoor unit and
outdoor component.

Transport the unit in its original
packaging as close as possible
to the installation location.This
avoids transportation damage.

Check that the packaged
contents are complete and
inspect the unit for any visible
signs of transportation damage.

Immediately notify any
deficiencies to the contractual
partner and forwarding agent.

Lift the unit by its corners
and not the refrigerant or
condensation connections.

Insulate the refrigerant pipes
(injection and suction pipe),
valves and connections to make
them tight against vapour
diffusion. If necessary, also
insulate the condensation pipe.

Select an installation location
which allows air to freely flow
through the inlet and outlet
(see section "Minimum
clearances").

Do not install the unit
adjacent to any hotspots. Unit
performance will be impaired if
installed next to hotspots.

Installation material

The indoor unit is fastened by

the

back of its

housing using 4 screws

to be provided by the customer.

Selecting the installation
location

The indoor unit is designed for
horizontal wall-mounting high up
on walls (min. 1.75 m above the
level of the floor).

Installation instructions for qualified personnel

Use caps or adhesive tape to
seal off the open refrigerant
pipes and prevent the ingress of
humidity. Never kink or push in
the refrigerant pipes.

Only use the union nuts
supplied with the refrigerant
pipes. These should only
be removed shortly before
connecting the refrigerant
pipes.

Establish all electrical
connections in accordance with
the relevant DIN- and VDE
standards.

Ensure the electrical cables
are properly connected to the
terminals,
otherwise there is a risk of fire.

REMKO ATY

18

This manual is related to the following products: